The Energy Challenge of Our Generation
Supply vs. Demand
300
Nuclear Plants
The US has 56 operating nuclear plants today — producing about 19% of the nation's electricity. At 4% annual grid growth, we'd need 300 equivalent plants by 2040.
10–15 years to build. Even if we started all 244 today, they wouldn't be online before 2040.
Distributed Solution
VPP
Virtual Power Plants
Smart EV charging doesn't just consume energy — it stores and returns it. Every building equipped with Juicer's End-to-End Charging Solution becomes a micro grid asset, drawing off-peak and dispatching back during peak demand.
30% of the U.S. population lives in multi-family. As a result, they will be the highest concentration of EV owners in the U.S. On top of that, the number one line item on a P&L for multi-family is electricity. Lastly, only 5% of apartments even have a single charger today.
Off-peak charging
Draws from the grid during low-demand windows, reducing strain at peak hours.
Distributed storage
BALANCER stores energy onsite, acting as a buffer between the grid and building demand.
Grid dispatch revenue
Operators earn revenue by selling stored energy back to the grid as a Virtual Power Plant.
It's critically important: we continue to invest in nuclear and many other grid solutions. But we also need creative solutions that can get us there faster with less grid reliance. The answer isn't one silver bullet. It's distributed infrastructure deployed at scale, starting now.
Nuclear Build Timeline vs. Grid Demand Growth
The Creative Solution