The Energy Challenge of Our Generation

How Are We Going to Power It All?

Supply vs. Demand

300

Nuclear Plants

The US has 56 operating nuclear plants today — producing about 19% of the nation's electricity. At 4% annual grid growth, we'd need 300 equivalent plants by 2040.

Current capacity 56
Needed by 2040 300

10–15 years to build. Even if we started all 244 today, they wouldn't be online before 2040.

Distributed Solution

VPP

Virtual Power Plants

Smart EV charging doesn't just consume energy — it stores and returns it. Every building equipped with Juicer's End-to-End Charging Solution becomes a micro grid asset, drawing off-peak and dispatching back during peak demand.

30% of the U.S. population lives in multi-family. As a result, they will be the highest concentration of EV owners in the U.S. On top of that, the number one line item on a P&L for multi-family is electricity. Lastly, only 5% of apartments even have a single charger today.

⚡

Off-peak charging

Draws from the grid during low-demand windows, reducing strain at peak hours.

🔋

Distributed storage

BALANCER stores energy onsite, acting as a buffer between the grid and building demand.

📡

Grid dispatch revenue

Operators earn revenue by selling stored energy back to the grid as a Virtual Power Plant.

Plants Operating Today
56
The US has only 56 operating nuclear power plants — a fraction of what's needed to handle projected grid demand.
Years to Build One
10–15
Permitting, construction, and commissioning a single nuclear plant takes a decade or more — even under ideal conditions.
The Gap
244
Even if we started building today, we'd need 244 more plants than we have — and we don't have 15 years per plant to wait.

It's critically important: we continue to invest in nuclear and many other grid solutions. But we also need creative solutions that can get us there faster with less grid reliance. The answer isn't one silver bullet. It's distributed infrastructure deployed at scale, starting now.

Nuclear Build Timeline vs. Grid Demand Growth

2025203020352040+
Current nuclear capacity (19% of grid)
Needed by 2040 (4% demand growth)
Distributed solutions can help bridge the gap now

End-to-End EV Charging
Infrastructure, Deployed Fast

Online in Days — Not Years